G The Rogue Intern Exhibit GDay 001 Français

Exhibit G

The lift

The maintenance log of lift 2, east tower. The engineer printed it, then threw it away. Not far enough.

EAST TOWER · LIFT 2 · MAINTENANCE LOG · DAY 001

08:39:02  CALL      floor 0 → 32          card ****3107
08:39:51  STOP      between 30 and 32     doors OPEN
08:44:03  DOORS     closed                load 1 → 0
08:57:40  CALL      floor 32 → 14         card ****3107
09:31:15  CALL      floor 14 → 32         card ****3107
09:32:02  STOP      between 30 and 32     doors OPEN
09:43:48  DOORS     closed                load 2 + trolley → 0
09:44:10  CALL      → 0                   EXPRESS

ENGINEER’S NOTE: there is no landing between 30 and 32.
Please stop logging stops there.

At 08:41, while the lift stood open between the 30th and 32nd floors, an email left floor 31. At 09:31, twenty-four minutes after the intern pressed Enter, two people and a trolley went up the same way. Nobody has said what was on the trolley.